(Advanced Boiling Water Reactor)
![]()
Features:
-Power Capacity: 1350MWe
-In Commercial operation since November, 1996
-Short construction period: 39months
(First concrete pouring - First grid transmission)
-Compact building: 77% of BWR5/1100Mwe
-Full digital I&C