Experience
Purpose of Core Shroud Replacement
Core Shroud Replacement Method and Sequence
Main Essential Technology
Reduction of Radiation Exposure
Nuclear Energy Systems & Services Division
Home > Nuclear Power > Maintenance Technologies >

Core Shroud Replacement Work

 

Reduction of Radiation Exposure


Mockup Training

View of new core shroud installation training View of RPV bottom head work area training
View of new core shroud installation training View of RPV bottom head work area training

  • Toshiba constructed a full size mockup test facility to train the work team in a simulated RPV environment in order to achieve quick and accurate results at 1F-3.

RPV Bottom Head Work at 1F-3

RPV Bottom Head Work at 1F-3 1 RPV Bottom Head Work at 1F-3 2

  • Chemical decontamination and in-vessel shielding installation were
    performed to make the bottom head area accessible for workers.

  • After these tasks were completed, the dose rate in the bottom head
    was reduced to 0.2-0.4 mSv/hr*.

  • No respirators were required to be worn inside the RPV. The picture
    on the left shows an engineer standing in the bottom of the RPV.

* This value is about the same as a person receives during a routine chest x-ray (0.3 mSv).


 